Launch offer Business seats $19/month $50 — subscribe by 30 November and keep the price. Claim it
Help and troubleshooting

Glossary

Plain-English meanings of the terms used in Chainage and in Queensland road work, from AADT to TGS.

The terms you'll see in Chainage, in plain English.

Road terms

ChainageThe distance along a road from the start of its road section, in kilometres, for example 25.306 km.
CH km+mmmThe same chainage written as kilometres plus metres: CH 25+306 is 25 km and 306 m.
TMRThe Queensland Department of Transport and Main Roads, which manages the state-controlled road network and publishes the road data Chainage uses.
State-controlled roadA road managed by TMR, often called a Main Road: highways, motorways and main arterial roads. Council roads aren't state-controlled.
Road sectionTMR's ID for a length of road, such as 10A. Chainage starts again at 0 at the beginning of each section.
CarriagewayOne side, or part, of a road. Code 1 is an undivided road; 2 and 3 are the two sides of a divided road; 4 and 5 are outer carriageways; other codes are ramps, service roads and connecting carriageways.
Gazettal directionThe direction a road section is officially described in: the way its chainage counts up. On a divided road, carriageway 2 runs in the gazettal direction and carriageway 3 against it.
AADTAnnual average daily traffic: the average number of vehicles a day over a year.
Heavy vehicles (HV %)The share of traffic that is heavy vehicles, from TMR's traffic census.
NHVRThe National Heavy Vehicle Regulator, whose National Network Map shows which roads heavy-vehicle combinations can use.
TGS / TMPTraffic Guidance Scheme and Traffic Management Plan: the documents that set out how traffic is managed around work on the road.

More in Road sections and carriageways explained and Traffic volume (AADT) and heavy vehicles.

Chainage app terms

Dropped pinA point left exactly where you put it, off the road, with the nearest road's chainage alongside.
Chainage rangeA stretch of road between two chainages, drawn along the road, such as a lane closure or work zone.
SiteOne place a project works at, such as a ramp or an intersection. Each site has its own phases.
PhaseA stage of the work at a site, such as Stage 1 or Night works. Each phase has its own layers.
LayerA group of saved items within a phase, such as Signs or Detours. New items go into the current layer.
Base layerA layer shown in every phase, for things that don't change, such as existing conditions or site boundaries.
Share linkA link that opens a read-only view of a project for anyone who has it, with an optional password and expiry date.
SeatA place in a company on the Business plan. Every member and pending invitation uses one.

More in How projects work and Share a project with a link.

More in Help and troubleshooting

  • Turn on location access▶Fix “Location access needed” and other GPS problems on iPhone, iPad, Android and computers so Find my chainage can use your position.
  • The chainage doesn't look right▶What to check when a chainage looks wrong: snapping, the road and carriageway, GPS accuracy, council roads and roadside markers.
  • How accurate is Chainage?▶How Chainage works out chainage from TMR reference points, how close it is to TMR's data, and when to double-check.
  • Where the data comes from▶The sources behind Chainage: TMR open data for roads, chainage, traffic and speed signs, plus OpenStreetMap, the NHVR, councils and Google.

Background reading