The Bruce Highway is Queensland's main coastal artery, linking Brisbane to Cairns through Gympie, Maryborough, Rockhampton, Mackay and Townsville. It's also one of the busiest places to work on the state-controlled network. If you're planning, permitting or reporting work anywhere along it, you'll be working in its TMR road sections and chainages. This guide maps them out.
The Bruce Highway at a glance
- Length: about 1,671 km. TMR quotes 1,671.3 km from Pine River to Cairns for its upgrade program, and the 14 sections in TMR's road data add up to 1,671.4 km.
- Start and end: it starts at Bald Hills on Brisbane's northern edge, near the Gateway Motorway interchange and the Pine River, and ends in Cairns.
- TMR road number: 10, in 14 sections, 10A to 10P. There's no 10I or 10O.
- On the signs: it's route M1 from Brisbane to Curra, north of Gympie, and A1 from there to Cairns. Route numbers are for navigation; TMR's road number is 10 throughout.
- Network: a key route on the National Land Transport Network, managed by TMR.
All 14 sections
Chainage on the Bruce Highway increases northwards: the gazettal direction of every section runs from its southern town to its northern town. And it starts again at zero in every section, so the end of one section is chainage 0 of the next.
| Section | From – to | Length (km) | Divided (approx. km) |
|---|---|---|---|
| 10A | Brisbane – Gympie | 144.8 | 144.8 (all of it) |
| 10B | Gympie – Maryborough | 83.3 | 22 |
| 10C | Maryborough – Gin Gin | 111.6 | 1 |
| 10D | Gin Gin – Benaraby | 146.4 | 2 |
| 10E | Benaraby – Rockhampton | 121.1 | 8 |
| 10F | Rockhampton – St Lawrence | 178.0 | 14 |
| 10G | St Lawrence – Mackay | 156.0 | 10 |
| 10H | Mackay – Proserpine | 123.2 | 6 |
| 10J | Proserpine – Bowen | 63.8 | 0 |
| 10K | Bowen – Ayr | 112.1 | 1 |
| 10L | Ayr – Townsville | 77.9 | 4 |
| 10M | Townsville – Ingham | 120.5 | 36 |
| 10N | Ingham – Innisfail | 147.4 | 12 |
| 10P | Innisfail – Cairns | 85.3 | 24 |
| Total | Brisbane – Cairns | 1,671.4 | about 284 |
Section names are TMR's. Lengths are the highest chainage on each section's main carriageways, and the divided lengths are where TMR's data has separate carriageways for each direction, both from TMR's road location data as used in Chainage in 2026. TMR updates that data regularly, so expect small differences, and bigger ones where new road has opened.
What the numbers tell you
- 10A is divided end to end. All 144.8 km from Brisbane to Gympie has separate northbound and southbound carriageways, so every chainage in 10A needs a carriageway or direction to be complete.
- North of Gympie it's mostly a two-way road. Of the roughly 1,527 km from Gympie to Cairns, only about 140 km is divided, mostly around the cities: north of Gympie, through Rockhampton, Mackay and Townsville, and into Cairns. The rest is a single carriageway (code 1).
- The longest section is 10F, Rockhampton to St Lawrence, at 178 km; the shortest is 10J, Proserpine to Bowen, at 63.8 km, and it has no divided carriageway at all.
- Lots of side carriageways. Around the cities, sections have many extra carriageway codes for ramps, service roads, roundabouts and flyovers. Section 10A alone has a dozen besides its two main carriageways.
Carriageways on the divided parts
Because the gazettal direction is northbound, on divided parts of the Bruce Highway:
- carriageway 2 is the northbound side (divided, in the gazettal direction);
- carriageway 3 is the southbound side (divided, against the gazettal direction);
- ramps and service roads have letter codes, such as A, B and C on the left of the main carriageway and Q, R and S on the right.
On the undivided parts, the whole road is carriageway 1. To describe a side of the road there, say "northbound" or "left in gazettal direction". For more on the codes, see What is chainage?
Major works that affect chainages
The Bruce Highway is under constant upgrade. TMR reports more than $10.39 billion of works delivered under the Bruce Highway Upgrade Program since July 2013, and a separate $9 billion Bruce Highway Targeted Safety Program, jointly funded 80:20 by the Australian and Queensland governments, focused on priority sections north of Gympie. Recent and current projects include:
- Gympie bypass (Cooroy to Curra Section D): 26 km of four-lane highway from Woondum to Curra, open to traffic since 16 October 2024.
- Caboolture–Bribie Island Road to Steve Irwin Way: 11 km widened from four to six lanes, completed in April 2024.
- Rockhampton Ring Road: 17.4 km of new road west of Rockhampton, including a new 435 m bridge over the Fitzroy River, under construction since mid-2025.
- Tiaro bypass: an 8.5 km four-lane bypass, with procurement opened in July 2026.
- Haughton River floodplain upgrade south of Townsville, completed in August 2022 to reduce flood closures that used to happen every one to two years.
Bypasses and realignments change the length of a section, which can shift every chainage after the change. That's why a chainage from an older drawing can disagree with today's data on the same stretch of road. Always check which data a chainage came from, and use current TMR data for new work.
Finding Bruce Highway chainages in Chainage
- Search a section: type 10F or Bruce Highway in Chainage to pick a section, then use Find another chainage on this road to jump to any chainage, or Road start and Road end to see where the section begins and ends.
- Tap or use GPS: tap anywhere on the highway, or use Find my chainage, for the section, carriageway and chainage. Zoom in on divided parts and tap the carriageway you mean.
- See the marks: zoomed in, the highway shows chainage marks every 100 m, labelled every 500 m.
- Read the conditions: each result shows the traffic volume (AADT), heavy vehicle percentage and nearest surveyed speed sign for that point.
When you quote a Bruce Highway location, always include the section: "10D Ch 37.250" can be found by anyone; "Bruce Highway, chainage 37.25" could be in any of 14 places.
Frequently asked questions
How long is the Bruce Highway?
About 1,671 km from Brisbane to Cairns. TMR quotes 1,671.3 km from Pine River to Cairns, and the 14 sections in its road data add up to 1,671.4 km.
How many TMR road sections does the Bruce Highway have?
Fourteen: 10A to 10P, skipping I and O. 10A is Brisbane to Gympie and 10P is Innisfail to Cairns. Chainage restarts at zero at the start of each section.
What does 10A mean?
10 is TMR's road number for the Bruce Highway, and A is the first section, Brisbane to Gympie. TMR allocates section letters in order along the road in the gazettal direction.
Which direction does chainage increase on the Bruce Highway?
Northwards. The gazettal direction of each section runs from its southern town to its northern town, for example Brisbane to Gympie for 10A.
Is the Bruce Highway M1 or A1?
Both: on route signs it's M1 from Brisbane to Curra, north of Gympie, and A1 from Curra to Cairns. TMR's road number for the whole highway is 10.
Sources
- Queensland Government Open Data Portal, Road location and traffic data (TMR), for section names, lengths and carriageways.
- TMR, Bruce Highway Upgrade Program and Bruce Highway Targeted Safety Program.
- TMR, Cooroy to Curra Section D, Rockhampton Ring Road and Caboolture–Bribie Island Road to Steve Irwin Way.
- Queensland Government ministerial statements on the Tiaro bypass and the Haughton River floodplain upgrade.
- Infrastructure Australia, Tiaro Bypass evaluation (National Land Transport Network).
- Wikipedia, Bruce Highway (route numbers and end points).